As a subcontractor for Divane Brothers Electric Co., McDonagh Demolition installed underdrain and inspection hole structures as well as three catch basins with associated pipe runs. Two large (approximately 7.5’x7.5’x7.5’) airfield rated manholes were set by crane over night in an island during a runway closure. McDonagh Demolition also picked up removal items and storm water protection items such as inlet/outlet protection and rock check dams and miscellaneous items such as signage and sidewalk.