Client – Chicago Dept. of Aviation
Project – Chicago Midway International Airport Irrigation System
Overview – This project consisted of installing automatic irrigation systems at various parking lots and parcels around Midway Airport. Work consisted of tapping existing water mains for feeding irrigation lines, installation of underground meter vaults, running of underground irrigation lines and sprinkler heads, and installation of controller cabinets at each location. A portion of the work was performed in active roadways, which required traffic control and pavement restoration.

MDW 1MDW 3