Client – Chicago Dept. of Aviation
Project – Terminal 2 & 3 Vestibule Upgrades
Overview – The 22 entrance and exit locations on the upper and lower level vestibules at Terminal 2 & 3 were previously floored with an aged, grated matting that was in need of replacement. A new flooring system was installed consisting of a durable, poured-in-place resinous product with a broadcast flake finish. The lower level vestibules were previously constructed with utility trenches underneath the existing flooring at the vestibule perimeter. Stainless steel floor plates were installed and secured to the existing grating covering of these trenches allowing for easier maintenance access to the utility trenches.

T2-T3-01  T2-T3-03 T2-T3-04 T2-T3-05