Client – Chicago Public Schools
Project – Disney II Magnet High School

Overview – Prior to the start of construction we remediated asbestos materials within classrooms and at the existing roofing system prior to demolition. Remodeling was performed in the existing classrooms to create new science classrooms with preparation rooms including laboratory casework with epoxy resin counter tops and sinks, acid neutralization basins, gas turrets, emergency eye wash and shower, ceramic tile floors in green house area, sheet vinyl, VCT and terrazzo flooring, window treatments, acoustic ceiling systems, laboratory equipment, doors, frames and hardware, electrical, fire alarm, and telecommunication work with installation of smart projectors. Tasks on the job included replacing approximately 700 lockers, replacement of existing auditorium theater curtains, rigging system and drapery, installation of projection screens, marker boards and tack boards, installation of Class 1A-90 roofing system (which required raising perimeter masonry/granite parapet walls with new coping), replacement of roof drain heads with lining of damaged roof drain lines, and installation of roof mounted mechanical equipment with perimeter lighting system.

Disney 4 Disney 5 Disney 6  Disney 8 Disney 9 Disney 10Disney 11
th